In France, production was impacted by higher well downtime
associated with a much higher than expected well repair
frequency and a number of pipeline failures in the Chaunoy
field. Volumes in the latter part of the second quarter
rebounded significantly as the well repair queue was reduced
and pipelines in Chaunoy were repaired. The pace of workovers
increased late in the second quarter of 2008 and should
offset any further declines from the France properties over
the balance of the year. Drilling activities, originally
scheduled for the third quarter have been delayed until
the fourth quarter due to rig availability.
Operational
Activities
In France, activity focused on a significant number of well
repairs (mainly pump replacements) related to several causes
including extended shut-in periods, summer electrical storm
activity and waterflood optimization efforts. This activity
tied up the workover rigs, limiting other workover and recompletion
activity during the quarter. Well work during the second
half of the year will focus primarily on workovers, stimulations
and recompletions, which should offset production declines.
A 43
square kilometre 3D seismic program at Cazaux was completed
during the quarter. This information is expected to improve
the number and quality of drillable prospects available
to Vermilion in this field. Vermilion continues to refurbish
the main storage tanks at the Ambès terminal and
expects to complete this work by year-end.