Before we can produce oil, we drill to determine if there is crude oil in the subsurface. That step requires a lot of upstream work and coordination, in particular with nearby Government services and all stakeholders.
The issue of a Mining title by the Minister in charge of the Mines doesn’t authorize the owner to start drilling work without the agreement of the department prefect.
Before starting drilling work, it is mandatory to ask for an administrative authorization. That request is submitted to a public inquiry and includes an impact study and a danger study revolving around three main points:
A feasibility study consists of evaluating whether the project is feasible by taking into account the following topics:
Choosing a drilling site from among potential sites is done through the following criteria :
(Unless otherwise noted, references on this website to “Vermilion”, or “the Company”, or “we”, or “our” collectively refer herein to any or all of the people and operations associated with Vermilion Energy Inc. and/or its subsidiaries including its French subsidiary Vermilion Energy France REP SAS whose operations and activities are the focus of this website)
Route de Pontenx
40160 Parentis-en-Born, France
Phone +33 (0)5 58 82 95 00
Email
Emergency Number 0 800 18 32 14