Information on the planned (maintenance) and unplanned unavailability of the Corrib gas field in accordance with its obligations under Regulation (EU) No 1227/2011 on wholesale energy market integrity and transparency (REMIT) is available here.
Parties interested in Urgent Market Messages (UMMs) from the Bellanaboy Bridge Gas Terminal can subscribe to an RSS feed by using the following link here in a RSS feed reader or by selecting one of the UMMs published by VEPIL on the Solien website and subscribing to the RSS feed shown at the bottom of each UMM.
Below is the historic UMMs that were published on the VEPIL website. The tables below will no longer be updated. These will remain on the VEPIL website for a period of time in line with REMIT regulations for historic information archive.
Please be advised that the flow to the GNI pipeline from the Bellanaboy Bridge gas terminal has been reduced.
Time Published | Time of Event | Expected End | Actual End | Volume Impact MCM/Day |
---|---|---|---|---|
17.06.2019
11:30 | 17.06.2019
11:00 | 18.06.2019
00:00 | 17.06.2019
15:00 | 0.57
11:00 – Unplanned shutdown of the plant has occurred and the startup of production is unknown.
12:50 – Terminal started ramp up. Expected full production from 15:00.
15:00 – Terminal completed ramp up, full production from 15:00. |
17.05.2019
11:15 | 17.05.2019
11:00 | 17.05.2019
16:00 | 17.05.2019
13:00 | 0.5
11:00 – Unplanned shutdown of the plant has occurred and the startup of production is unknown.
13:00 – Terminal completed ramp up, full production from 13:00. |
18.04.2019
20:55 | 18.04.2019
17:30 | 19.04.2019
06:00 | 19.04.2019
10:30 | 3.3
17:30 – Unplanned shutdown of the plant has occurred and the startup of production is unknown.
05:15 – Terminal began ramp up at 05:00 and is expected to be completed by 09:00.
10:34 – Terminal completed ramp up, full production from 10:30. |
09.03.2019
00:30 | 09.03.2019
00:30 | 09.03.2019
06:00 | 09.03.2019 10:30 | 1.5
00:30 – Unplanned shutdown of the plant has occurred and the startup of production is unknown.
05:45 – Terminal began ramp up at 05:45 and is expected to be completed by 10:00.
10:10 – Terminal completed ramp up, full production from 10:30. |
26.02.2019 14:30 | 26.02.2019 14:20 | 27.02.2019 22:00 | 27.02.2019 20:19 | 1.2
14:20 – Unplanned shutdown of the plant has occurred and the startup of production is unknown.
18:44 – Terminal began ramp up at 18:15 and is expected to be completed by 22:00.
20:19 – Terminal completed ramp up, full production from 19:45 |
20.02.2019 09:10 | 20.02.2019
09:03 | 21.02.2019
05:00 | 20.02.2019
12:00 | 09:10 – Unplanned shutdown of the plant has occurred and the startup of production is unknown.
10:20 – Ramp up to full production started at 10:00 and expected to be completed by 13:00.
12:30 – Ramp up to full production is completed by 12:30 successfully |
19.02.2019
16:30 | 19.02.2019
15:30 | 20.02.2019
05:00 | 20.02.2019
05:00 | 0.9
16:30 – Based on current information it is down, and will be up by the end of the gas day. We anticipate 3 hours of lost production.
18:05 – Start up of field now expected to begin at 18:30.
22:00 – Ramp up to full production started at 18:30 and was completed by 22:00 |
05.02.2019
14:15 | 05.02.2019
13:00 | 06.02.2019
05:00 | 05.02.2019
23:00 | 2.4
14:15 – Based on current information it is down till end of the day.
18:00 – Start up of field now expected to begin at 20:00.
23:00 – Ramp up to full production started at 20:00 and was completed by 23:00 |
17.12.2018
13:40 | 17.12.2018
13:40 | 18.12.2018
05:00 | 18.12.2018
05:00 | 4.9
14:30 – Based on current information it is down till end of the day.
18:00 – Start-up of field now expected to begin at 21:00.
20:00 – Ramping up to full production by end of gas day 17.12.2018. |
05.12.2018
20:15 | 05.12.2018
14:00 | 06.12.2018
05:00 | 06.12.2018
01:00 | 3.1 |
30.11.2018
19:00 | 30.11.2018
17:00 | 01.12.2018
05:00 | 01.12.2018
09:00 | 3.7
Ramping up to full production at
the start of gas day 01.12.2018. |
The information given is in good faith to the best of our knowledge at the time of posting, but no warranty is given as to its accuracy or completeness. When an update about an event becomes available, the entry in the table will be updated accordingly.
Please be advised that the flow to the GNI pipeline from the Bellanaboy Bridge Gas Terminal will be reduced for the following planned outage(s):
Time Published | Time of Event | Expected End | Actual End | Volume Impact MCM/Day |
---|---|---|---|---|
23.04.2019 08:51
26.04.2019 08:31 | 28.04.2019 05:00 | 29.04.2019 05:00 | 29.04.2019 05:00 | Well Testing – 0.2mcm/day reduction (2GWhr/day)
Postponed from 26.04.209 to 28.04.2019
|
21.03.2019 16:15 | 22.04.2019 05:00 | 23.04.2019 05:00 | 21.04.2019 | Well Testing – 0.2mcm/day reduction (2GWhr/day)
Update – Cancelled |
21.03.2019 16:15 | 15.04.2019 05:00 | 16.04.2019 05:00 | 16.04.2019 05:00 | Well Testing – 0.2mcm/day reduction (2GWhr/day) |
21.03.2019 16:15 | 09.04.2019 05:00 | 10.04.2019 05:00 | 10.04.2019 05:00 | Well Testing – 0.2mcm/day reduction (2GWhr/day) |
01.02.2019 11:00
05.02.2019 12:48 | 22.02.2019 05:00 | 23.02.2019 05:00 | 05.02.2019 12:48 | Well Testing – 0.3mcm/day reduction (3.5GWhr/day)
Update – Cancelled |
01.02.2019 11:00
11.02.2019
17:00 | 17.02.2019 05:00 | 18.02.2019 05:00 | 18.02.2019 05:00 | Well Testing – 0.3mcm/day reduction (3.0GWhr/day)
Update – 0.6mcm/day reduction (7GWh/Day) |
01.02.2019 11:00 | 04.02.2019 05:00 | 05.02.2019 05:00 | 05.02.2019 05:00 | Well Testing – 0.3mcm/day reduction (3.5GWhr/day) |
03.01.2019 08:20 | 09.09.2019 05:00 | 13.09.2019 05:00 | 03.01.2019 – Full field shutdown – GNI testing
18.01.2019 – Shutdown is now cancelled – no impact on production | |
03.01.2019 08:20 | 07.03.2019 05:00 | 08.03.2019 05:00 | 03.01.2019 – Full field shutdown – GNI testing
18.01.2019 – Shutdown is now cancelled – no impact on production | |
17.09.2018
08:30 | 11.09.2018
06:00 | 15.09.2018
06:00 | 14.09.2018
17:00 | 9.0
Start-up of field now expected
during gas gas 14.09.2018
with return to full produciton
on 15.09.2018 |
The information given is in good faith to the best of our knowledge at the time of posting, but no warranty is given as to its accuracy or completeness. When an update about an event becomes available, the entry in the table will be updated accordingly.
(Unless otherwise noted, references on this website to “Vermilion”, or “the Company”, or “we”, or “our” collectively refer herein to any or all of the people and operations associated with Vermilion Energy Inc. and/or its subsidiaries including its Irish subsidiary Vermilion Exploration & Production Ireland Limited whose operations and activities are the focus of this website)